Landscaping Grid Plastic Pavers Grid for Driveways

Item No.:MZ-650
Size: 410x430x50mm
Material: HDPE (high-density polyethylene)
Pressure Strength: 180ton/sqm

piada porque o viagra azul what is a dbq essay write critical review essay bookings report farsix furosemide lasix click essay on crimes and punishments 1764 viagra fast delivery uk essay on computer ki atmakatha in hindi https://efm.sewanee.edu/faq/essay-about-nick-carraway-in-great-gatsby/22/ angela carter the bloody chamber essay topics follow url abstract example in thesis niels bohr doctoral thesis essay what my best friend taught me get link essay reader response theory go oliver stone essay https://www.aestheticscienceinstitute.edu/medical/canadanonprescription-pharmacy/100/ follow site https://bigsurlandtrust.org/care/viagra-men/20/ click here blindness oedipus essay megapharmnorx men's health cialis accounting dissertations titles https://www.nationalautismcenter.org/letter/example-of-research-proposal-crime/26/ presentation ideas is generic viagra safe yahoo como puedo tomar la viagra best places to buy viagra example introduction paragraph analytical essay Product: Grid

Item No.:MZ-650 | Porous for Car Parking

Size: 410x430x50mm

Material: ()

Landscaping Grid | Plastic Pavers Grid for  Technical Data:

Item No. MZ-650
Size 410x430x50mm
Picture  grass_grid_MZ-650
Apply Place  access roads;
emergency access lanes;
car parks;
vehicle hardstandings;
Pressure Strength  1764KN/sqm(180ton/sqm)
Weight  4.55kg/sqm
Material  HDPE(high-density polyethylene)
Durability  durability of at least 8 years in neutral ground of 4 < pH < 9
Working Temterature  Apply in temperature of -40℃ to 90℃
Anti HCL  According to GB4218-1984, 30%x24h, no visible change
Anti NaOH  According to GB4218-1984, 40%x24h, no visible change
Thermal Aging  According to GB/T 7141-1999, 70ICx24h, no visible change
Anti UV  According to GB/T 18830, UPE>30 T(UVA)AV<5%, qualified
Package  Bundle, 8pcs=2sqm=1bundle
Loading Capacity 700sqm=1x20ft container;1420sqm=1x40ft container;1628sqm=1x40HC container;

Landscaping Grid | Plastic Pavers Grid for Driveways Installation Guide:
subsoil layers for parking lot grids

grass_grid_installation_procedure
grass_grid_installation_procedure

Landscaping Grid | Plastic Pavers Grid for Driveways Projects:

grass_grid_project_pic_01  parking_lot08 parking_lot09

Landscaping Grid | Plastic Pavers Grid for Driveways

Gravel Grid :
Parking for
Delivery truck centers
Emergency service (Fire Access routes)
Car parks ( or gravel)
Overspill / overflow grass car parks
Service access roads
Road waysides
Maneuvering square
and residential lawn / gravel parking
Streetcar subgrades
Railway embankments
Slope and embankment reinforcement
Melioration ditches
Recreation
Cycling and pedestrian trails
Aircraft Taxiways & Helipads
Golf buggy paths
Camping sites
Paddocks, horse studs
Home and garden
Driveways
Garden pathways
Pond banks and floor
Lawn against wildlife
Home surroundings (gravel draining system)

Grid Method
1. The density of the soil layer should be compacted at lease 85%.
2. The thickness of the compacted gravel layer should be about 350mm. spread out and make it flat, laminate until it become densely.
3. Pave 70mm thickness small gravel (20%soil, 20%sand mixed with 60% small gravel) as leveling layer.
4. Pave grass grids, you can also cut the grass grid into suitable shape by saw, leave a little millimeter between the grids.
5. After paving grass grids, if need, you can use the fixed nails to further strengthen the grass grids.
6. If with grass seed, Load grass grids with planting soil, leave one centimeter, sow grass seeds and then sprinkle a thin layer of soil.
7. If paving with turf, first full-filled the grass grid with planting soil, use scraping straightedge to make the surface flat. When paving the turf, leaving about 2cm gap stagger the . Watering until floating slurry, with a small roller or plate vibration machine to suppress turf into grass grid repeatedly.
8. Parking spaces can use the marble strips or others sectors to mark parking spaces, also can use eye-catching hat tag, embedded in the cellular grid as separator for parking
9. The lawn needs to build four to six times a year, and should timely removal of weed, fertilization. In the hot dry season, should be watering regularly or install automatic watering equipment to make the necessary conservation and management.

  • Download PDF File
  • Download Word File

INQUIRY NOW

We always looking forward to hearing from you!
Get in touch and we’ll get back to you as soon asap.