Modular surface water infiltration and storage tanks manage runoff below ground while keeping the surface available for landscaping, parking or other planned uses. The hydraulic objective determines how the same plastic cell structure is wrapped, connected and controlled: infiltration returns water to suitable soil, attenuation limits discharge, and storage retains water for approved reuse.
This page helps contractors and project buyers compare those functions and shortlist a GS Tank module. Final sizing and structural design must be completed against the site’s rainfall, catchment, soil, groundwater, cover and loading conditions.
Infiltration, attenuation or rainwater storage?
| System function | Typical wrapping | Water movement | Key design check |
|---|---|---|---|
| Infiltration | Permeable geotextile | Stored runoff disperses into surrounding soil | Infiltration rate, groundwater separation and pollution risk |
| Attenuation | Impermeable liner with protective geotextile | Water leaves through a controlled outlet | Allowable discharge rate, overflow and drawdown time |
| Harvesting / storage | Impermeable liner with protective geotextile | Water is pumped or gravity-fed for approved reuse | Water quality, treatment, usable volume and backup supply |
An infiltration tank should not be selected simply because the site has available space. Poorly draining soil, high groundwater, contaminated runoff or foundation constraints may require attenuation or lined storage instead.
Surface runoff needs pretreatment
Compared with roof runoff, surface water from roads, parking areas and hard landscaping can carry more sediment, litter, hydrocarbons and fine particles. Pretreatment protects the tank, reduces clogging and improves long-term performance.
- Provide catch pits, silt traps or sedimentation sized for the catchment.
- Use oil separation or additional treatment where the land use and local rules require it.
- Provide accessible inspection and maintenance points upstream of the tank.
- Keep construction sediment out of the completed system before commissioning.
- Define a safe overflow route for events that exceed the design storm.
GS Tank module comparison
| Model | Nominal size | Indicative load range | Void ratio | Water volume | Unit weight |
|---|---|---|---|---|---|
| M2014 | 680 × 410 × 450 mm | 25–35 t/m² | 88–92% | 110 L | 8 kg |
| M2015H | 800 × 490 × 250 mm | 28–38 t/m² | 88–92% | 90 L | 7.5 kg |
| M2015F | 800 × 490 × 530 mm | 28–38 t/m² | 90–93% | 185 L | 12.7 kg |
| M2016S | 1,000 × 500 × 500 mm | 30–40 t/m² | 90–93% | 235 L | 15 kg |
| M2016B | 1,200 × 600 × 700 mm | 35–45 t/m² | 90–95% | 475 L | 27 kg |
These are historical listing values for initial comparison. Confirm the current module drawing, PP grade, test report, allowable design value and assembly configuration before specification. The complete system capacity is based on installed gross volume and the verified void ratio, not the external tank dimensions alone.
M2014
M2015H
M2015F
M2016S
M2016B
Site information required for selection
- Hydrology: catchment area, runoff coefficient, local design rainfall and required storage volume.
- Hydraulic objective: infiltration, controlled discharge, retention for reuse or a combined system.
- Ground conditions: infiltration test, soil profile, groundwater level, contamination and distance from structures.
- Geometry: available footprint, target depth, pipe levels and access constraints.
- Structural conditions: burial depth, backfill, pavement build-up, traffic or landscape load and construction plant.
- Approval route: required standards, test reports, material declaration and local authority criteria.
Tank components and hydraulic connections
The cell block is only the storage core. A complete system may include inlet chambers, filtration, geotextile, impermeable membrane, protective fleece, distribution pipes, controlled outlet, pump chamber, ventilation, inspection access and emergency overflow.
M2015 and M2016 assembly formats
M2015 series: a plate-based structure that supports different module heights and tank profiles when assembled to the approved drawing.
M2016 series: a larger column-and-plate system intended for rapid assembly and higher volume per unit in compatible layouts.
Installation and commissioning overview
- Confirm excavation, base level, groundwater control and safe working method.
- Prepare the level base and install the specified geotextile or membrane system.
- Assemble cells and connectors to the approved layout without damaged components.
- Install inlet, outlet, inspection, ventilation and overflow connections.
- Close the wrapping system, test lined tanks where required and place protection layers.
- Backfill evenly with the specified material and compaction method.
- Complete the pavement or landscape build-up and commission the pretreatment system.
Frequently asked questions
Can surface water go directly into the modules?
Normally no. Surface runoff commonly requires sediment and pollution control before it reaches the tank. The treatment level depends on the catchment and intended discharge or reuse.
How is usable storage calculated?
Start with the installed gross tank volume, then apply the verified void ratio and account for pipe levels, freeboard, sediment allowance and any permanently retained water specified by the designer.
Can one tank combine infiltration and controlled discharge?
Yes, a hybrid strategy may be possible, but it requires site-specific hydraulic design and suitable ground conditions.
Model links and project support
Compare the underground rainwater tank range, including M2014, M2015H, M2015F, M2016S and M2016B.
Send the project data to Leiyuan for module selection, current technical documents, packing and quotation.